POPULATION AND HOUSING

Background – Population Change in South Bedfordshire

6.1       The population of South Bedfordshire was a little under 46,000 in 1951. Since that date and particularly during the 1950s, 60s and 70s, the District saw considerable population growth concentrated in Dunstable, Houghton Regis and Leighton Buzzard.

 

6.2       Over this period, Dunstable experienced high levels of house building which produced a doubling of the population of the town to 31,828 by 1971 and its coalescence with Luton. The population increased marginally between 1971 and 1996 to 33,720, largely as a result of boundary changes. However, population growth stabilised during the 1990s and by 2001 it stood at 33,805.

 

6.3       During the same period, Houghton Regis, which in 1951 was a small village, was substantially expanded to accommodate London overspill population under the New and Expanded Towns Scheme and its population increased from less than 3,000 in 1951 to 10,490 in 1971. The planned expansion of Houghton Regis continued after the conclusion of the overspill agreement on land which was earmarked for such purposes during the operation of the scheme. As a result and despite a population loss to Dunstable as boundaries changed, the population of Houghton Regis reached 14,500 by 1981 and continued to grow, albeit at a slower rate, as committed housing land was released for development. The 2001 population was 16,970.

 

6.4       In 1967, Bedfordshire County Council published an Urban Structure Plan for Leighton-Linslade which, in response to a ministerial call for additional housing land in the south-east and notwithstanding the Green Belt policies proposed for southern Bedfordshire, allocated substantial areas of open land to the east and west of the town for residential purposes. This coincided with the electrification of the London - Midlands railway line serving the town and resulted in the doubling of the population between 1961 and 1981 (from 15,900 to 31,500), largely as a result of in-migration. As in other towns, population change has slowed since that time. The population in 2001 was 32,753.

 

6.5       Overall, the District population increased from 45,950 in 1951 to 107,500 in 1981. Since then, population growth has slowed considerably. Between 1981 and 2001 the population increased only marginally to 112,637. There are a number of reasons for this.

 

6.6       First, as a result of the application of restraint policies set down initially in the 1980 Structure Plan new house building has not matched the very high rates of the 1960s and the 1970s. Some new sites have been identified and brought forward for development on the fringes of settlements as Green Belt boundaries have been defined in local plans. However, these have been relatively few, and the majority of new housing development has taken place on sites already committed for development before 1981, or on 'fall-in' sites within the urban fabric of towns and villages.

 

6.7       Between 1981 and mid 2003, 9,852 dwellings were constructed in South Bedfordshire - a high figure but insignificant when compared to the levels experienced previously. (Between 1976 and 1979 for example, 2,630 dwellings were completed in Leighton-Linslade alone.)

 

6.8       Second, although the new houses constructed in South Bedfordshire during the 1980s have continued to attract large numbers of in-migrants, the potential population increase from this source has been offset by high levels of out-migration of local residents to lower cost housing areas in Milton Keynes, Northamptonshire and North Buckinghamshire. As a result, population growth has been lower than might have been expected from the levels of new house building.

 

6.9       Third, average household size has fallen significantly across the south-east region and this had the effect of further reducing the impact of in-migration to the District in gross population terms. Between 1991 and 2001 average household size fell from 2.56 to 2.4 persons per dwelling in South Bedfordshire – a trend which is forecast to continue.

 

The Future

 

6.10     In a departure from previous policy, the Structure Plan 1992 set district housing allocations which were significantly higher than locally generated housing needs in the period up to 2001. This seemed likely to have the effect of further stimulating in-migration in the District. However, the prolonged economic recession and the collapse of the housing market in the early to mid 1990s, resulted in very low levels of house building, and population change in the District. The 1997 Bedfordshire Structure Plan 2011 sets a housing allocation for the District of 8,800 dwellings. This broadly matches the forecast level of household growth derived from the age and sex characteristics of the District's population and anticipated demographic changes and headship rates.

General Objectives

6.11     The District Council's principal housing objective is to meet the housing needs of the District within the strategic policy framework and environmental, technical and physical constraints. In particular, the District Council is concerned to make provision for those households in South Bedfordshire least able to obtain satisfactory accommodation from their own resources. The District Council recognises that due to its accessibility to major employment areas, the high quality of its environment and relative cheapness of its housing compared to areas such as Hertfordshire, South Buckinghamshire and London, the District is highly attractive to in-migrants. The ability of some local residents to compete in the local housing market is, therefore, limited.

 

6.12     The District Council will, therefore, through planning policies directed at private house building, its own limited powers as a direct provider of housing and its wider enabling role, attempt to match housing provision with the housing requirements of South Bedfordshire's residents.

The Provision of Land for Housing

6.13     The allocation for the provision of land for housing in South Bedfordshire is set down in the Bedfordshire Structure Plan 2011. Policy 32 states that about 8,800 net additional dwellings are to be provided in South Bedfordshire between 1991 and 2011. Table 5 sets down the progress made so far in meeting this level of provision, the assumptions about future provision in respect of small unidentified sites of up to 0.4 hectares and the provision which needs to be made in this Local Plan.

 

TABLE 5:       HOUSING LAND REQUIREMENTS AND PROVISION – SOUTH BEDFORDSHIRE 1991-2011

 

 

(i)

 

Bedfordshire Structure Plan Housing Allocation:

 

8,800 dwellings

 

(ii)

 

Provision made up to 1st July 2003:*

 

6,469 dwellings

 

(iii)

 

Assumed provision of dwellings on small sites

1st July 2003-2011:**

 

 

585-810 dwellings

 

(iv)

 

Product from SBLP 2001-2011 allocated sites as at

1st July 2003 (including reassessment of remaining adopted local plan 1995 allocated sites being 'rolled forward' at an average density of 40 to the hectare) with a net developable area of 73.24 hectares:

 

 

 

 

 

3,218 dwellings

 

(v)

 

Total assumed supply [(ii)+(iii)+(iv)]:

 

10,272-10,497 dwellings

 

(vi)

 

It is assumed that by 2006 the following number of dwellings will have been completed or committed from small site windfalls and allocations:

Small site windfalls:

Allocations:

 

 

 

 

195-270 dwellings

928-938 dwellings

 

(vii)

 

Provision still to be made [(i)-(v)]:

 

-1,472 - -1,697 dwellings

 

 

NOTE:

*           This provision is mainly made up of completed dwellings, outstanding planning permissions and dwellings likely to be provided on sites allocated for housing development in the 1995 adopted South Bedfordshire Local Plan. The capacities for the sites allocated in the 1995 Adopted Local Plan and included in this figure were derived prior to the revaluation of their capacities at 40 per hectare, as at 1st July 2003; net capacity changes resulting from this exercise are included in (iv).

 

**         This figure is based on the number of completions on small sites (i.e. up to 0.4 hectare in size or 20 units) during the period since 1991. During this period the contribution made to housing supply by sites of this size has fluctuated from 36 dwellings in 1996 to 165 in 1994. Since 1991 the average has been 90 dwellings per annum. The range of 585-810 for the remainder of the Plan period is based on an assumption that the contribution will be in the range 78-108 per annum on small sites of this kind.

 

The Table above does not include any allowance for large site windfalls but historic completion rate evidence indicates that a figure of 60 dwellings per annum can be expected to come forward from this source. Monitoring will indicate the actual level of provision. It is envisaged that such windfalls will increase supply to offset any large sites which do not come forward.

 

Based on historic completion rates it is expected that 47% of new dwellings will come forward on previously developed land.

 

6.14     Government guidance on housing in Department of the Environment, Transport and the Regions', Planning Policy Guidance Note 3, (PPG3), 'Housing', advises that local planning authorities should plan to meet the housing requirements of the whole community on a choice of suitable and available sites whilst recognising that a balance has to be struck between the need for development and established principles of conserving and enhancing the environment.

 

6.15     In South Bedfordshire, the critical issue is the balance to be struck between the need to identify land for development for housing and other necessary purposes and the desirability of minimising the amount of development which takes place on greenfield sites. Minimising development on greenfield sites assists in maintaining the general extent of the Green Belt (in accordance with Government advice in PPG2, and Strategic and Regional Planning Policy Guidance) - protecting important landscape and wildlife resources, high quality agricultural land and valuable recreational space from development, and preventing the unnecessary sterilisation of important mineral reserves.

 

6.16     The District Planning Authority accepts that in this context there will have to be an emphasis placed in the Plan on the re-use of urban sites for housing development and that full use must be made of sites already earmarked for development on the edge of, and well related to existing settlements which have an adequate range of facilities and services. In some cases this will mean the use of land for housing purposes which was previously allocated for other uses - in particular B1-B8 employment uses.

 

6.17     The District Planning Authority is also aware of the necessity of bringing forward for development as part of the overall supply of land, some greenfield sites where these can be identified in locations which are compatible with the principles of sustainable development set out in this Plan. In most cases, this means bringing forward for development sites which were excluded from the Green Belt in earlier local plans and safeguarded to meet the unspecified longer term development needs of the District. In the South Bedfordshire Local Plan 1995 these sites are referred to as 'white' land sites and this notation, relating to the sites to which this now applies, is continued into this Local Plan Review.

 

6.18     The District Planning Authority recognises that for the reasons set out at paragraph 6.15 above, development land in South Bedfordshire is likely to remain in very short supply during and beyond the Plan period. It is also aware that the pattern of household change forecast for the Plan period which determines the level of housing provision to be made in South Bedfordshire, indicates that an increasingly large proportion of all households will be small ones and in particular, single person households. Provision of a significant proportion of small dwellings on development sites is therefore essential.

 

6.19     In these circumstances, the District Planning Authority is satisfied that development at higher densities will be appropriate on many sites and that overall densities in the range 37-42 dwellings per hectare could be achieved. In particular higher densities will be expected on sites close to urban centres and well served by public transport. On this basis, it is considered that the Local Plan will deliver sufficient residential development to meet Structure Plan requirements.

 

6.20     A number of additional housing sites are proposed for development in this Plan and are listed in the schedule which accompanies Policy H1. This will ensure that the outstanding Structure Plan housing allocation up to 2011 is met without conflicting with the sustainability principles and development strategy set out in Chapter 1 of this Plan. For the sake of completeness, sites allocated for residential development in the South Bedfordshire Local Plan 1995 are also shown in the schedule.

 

POLICY H1

 

PROVISION WILL BE MADE FOR ABOUT 8,800 ADDITIONAL DWELLINGS IN SOUTH BEDFORDSHIRE BETWEEN 1991 AND 2011. IN ADDITION TO EXISTING COMMITMENTS IN THE FORM OF PLANNING PERMISSIONS AND AN ALLOWANCE FOR THE CONTRIBUTION OF DWELLINGS ON UNIDENTIFIED SMALL SITES, THE SITES IN THE FOLLOWING SCHEDULE ARE PROPOSED FOR RESIDENTIAL DEVELOPMENT DURING THE PLAN PERIOD.

 

SCHEDULE OF PROPOSED HOUSING SITES OVER 0.4 HECTARES

 

Ref

No.

Location

Gross

Area

Net

Area

Indicative

Net

Capacities

Guidelines

Anticipated Phasing of Allocations: (Pre or

Post 2006)

 

1

 

Carter's Scrapyard, French's Avenue, Dunstable

 

1.49 ha

 

1.49 ha

 

72 dwellings

 

This brownfield site is capable of development for residential purposes once any contamination has been treated. Access is available from French's Avenue. The characteristics of the site and its surroundings make it appropriate for a medium/high density scheme providing not less than 55 dwellings. This site is considered to be in an area of high accessibility, where reduced car parking provision may be acceptable. Contributions will also be sought towards the implementation of recreational/leisure facilities in the area. Proposals should include pedestrian/cycle link(s) to connect with those proposed in the vicinity.

 

 

Post 2006

2

Hartwell Trucks, Skimpot Road, Dunstable

 

1.863 ha

1.863 ha

100 dwellings

Brownfield site. Access is available from Skimpot Road. The characteristics of the site and its surroundings make it appropriate for a medium/high density scheme providing not less than 75 units. The site adjoins the Translink corridor and the Chilterns AONB. Access to proposed and existing public transport facilities indicates that full compliance with car parking standards is not necessary on this site. A public footpath/bridleway runs parallel with the Translink corridor in the AONB. Development of the site will be subject to a planning brief indicating, amongst other things, the way that the development on the site relates to the Translink corridor and the AONB and how access from the site to the public footpath/bridleway will be obtained. Contributions will also be sought towards the implementation of recreational/leisure facilities in the area.

 

Pre 2006

3

Balkan Cars,

High Street North, Dunstable

0.69 ha

0.69 ha

28 dwellings

Brownfield site suitable for medium/high density development including flats. A minimum of 26 units should be provided on the site. Access from the A5 Watling Street may require traffic light control. The site is well related to public transport facilities – full compliance with car parking standards is, therefore, not essential. Site adjoins Houghton Quarry SSSI, a public footpath and Northfields school playing fields. To be acceptable, the proposals for the site must demonstrate satisfactory relationship between any development and the adjoining areas, in particular the A5 frontage, the SSSI and the school playing field.

Post 2006

4

Gas Works Site, North Station Way, Dunstable

 

0.95 ha

0.95 ha

46 dwellings

Brownfield site. Further decontamination of the site may be required. Access is available from North Station Way and/or Westfield Road. The site is suitable for a medium/high density scheme. This site is considered to be in an area of high accessibility, where reduced car parking provision may be acceptable. Contributions will also be sought towards the implementation of recreational/leisure facilities in the area.

 

Pre 2006

5

Regent Street / Manchester Place, Dunstable

 

1.08 ha

0.48 ha

29 dwellings

Town Centre Regeneration Site – A minimum of 0.48 hectares residential development. Central Dunstable location and good access to all facilities indicates low level of car parking provision would be appropriate. Context makes site suitable for high density flatted development.

 

Post 2006

6

Car Park – south end of Renault site – Carter's Yard and adjoining areas, Luton Road, Dunstable

2.36 ha

2.22 ha

87 dwellings

Brownfield redevelopment site. Net area takes account of highway safeguarding line for the Dunstable Bypass and the need for a buffer strip on the northern edge of the site. Site has good access to facilities/services and public transport. Low level of car parking provision is therefore appropriate. Site is suitable for high density flatted development. The layout of the development of the site must offer appropriate frontage treatment to Luton Road and Boscombe Road. A Development Brief has been prepared for the site and adopted by the Council specifying the ways that these issues are to be dealt with. Planning permission will not be granted for proposals which fail to conform to the Brief.

Pre 2006

7

Hartwell Ford, Station Road, Dunstable

 

1.1 ha

0.9 ha

72 dwellings

Brownfield site. Net area takes account of adjoining Translink Corridor and overhead power lines. Site has good access to facilities/services and public transport. A low level of parking provision is, therefore, appropriate. Location of the site, its character and surroundings indicate suitability for a high density development including flats. Contributions will also be sought towards the implementation of recreational/leisure facilities in the area. Proposals should include pedestrian/cycle link(s) to connect with those proposed in the vicinity.

 

Pre 2006

8

Three Valleys Water Premises, High Street South, Dunstable

0.58 ha

0.5 ha

10 dwellings

Brownfield site. Net area reflects on-site pumping station which will be retained. Access available from Bowmans Way. Medium Density development similar to existing Bowmans Way development is appropriate for this site. Good accessibility to public transport indicates that full compliance with parking standards is not necessary.

 

Post 2006

9

Brooke Engineering Union Street, Dunstable

 

 

 

 

Site developed.

 

10

Former Car Auction Site, Stanbridge Road, Leighton Buzzard

 

 

 

 

Site developed.

 

 

11

Camden Motors Site, Adjacent Bell Close, Lake Street, Leighton Buzzard

 

 

 

 

Site being developed.

 

 

12

Dunham and Haines Site, Leighton Road, Linslade

 

0.89 ha

0.44 ha

54 dwellings

Brownfield site partly within area at risk of flooding. Site is therefore subject to Policy IS3 which requires flood protection and mitigation measures to be taken as part of the redevelopment. No development will be permitted until such measures are in place. Highly accessible location, well related to services and facilities in the Town Centre and public transport. Low car parking provision is therefore appropriate. Site is suitable for high density development including flats. Developer contributions for the provision of necessary educational, social, recreational/leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Further details as to the level of contributions is a matter for the development brief.

 

Pre 2006

 

13

 

 

 

Land at RAF Stanbridge, Stanbridge Road, Leighton Buzzard

 

 

 

 

10.54 ha

(remaining without planning permission)

 

 

 

10.39 ha

(remaining without planning permission)

 

 

422 dwellings

 

 

 

Balance of the large MOD site part of which has already been redeveloped for housing. Net area reflects the need to provide a second access into this combined site and the 28 former RAF dwellings already on the site. The site could accommodate a medium density development.

 

Developer contributions for the provision of necessary educational, social, recreational / leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Proposals are set out in Table 4 in the Transport Chapter for new cycle routes linking the housing sites to the south east of Leighton Buzzard with the Town Centre. Developer contributions will be sought to secure the implementation of these proposals. Further detail as to the level of contributions is a matter for the already adopted Development Brief. Proposals should include pedestrian/cycle link(s) to connect with those proposals in the vicinity though account will be taken of the extent to which development of adjoining land has already achieved the objectives of the adopted Development Brief. Development elsewhere on the site of RAF Stanbridge has been successful in achieving the objectives of the adopted Development Brief and it is expected that the development yet to be implemented will continue to meet these objectives.

 

Proposals which do not comply with the requirements of the adopted Development Brief will not be acceptable.

 

 

Pre 2006

 

 

14

Pratts Pit, Billington Road, Leighton Buzzard

 

 

 

 

Site being developed.

 

15

Pratts Quarry, Billington Road, Leighton Buzzard

 

33 ha

27.5 ha

1200 dwellings

Active sand working site with planning permission for extraction and progressive restoration. Access will be taken from Billington Road. The site is suitable for medium density development, i.e. at an average overall density of not less than 37 dwellings per hectare. The combined sites 14 (already under development) and 15 will generate a requirement for the provision of substantial formal and informal land and facilities for recreational purposes. Some informal recreational open space provision may be able to be made on-site. The balance of the recreational open space required will be provided on the 'R7' land between the Site and the bypass. A link to RAF Stanbridge recreational facilities will also be required. The scale and nature of open space provision on the site and the costs of site development, will be taken into account in determining both the balance of open space off-site, and the level of affordable housing to be provided.

 

A revised Development Brief for this site will be required to reflect changed circumstances. This will specify, amongst other things, the provision of pedestrian and cycle routes within and beyond the site and the level of public transport support required to enable development to take place.

 

Developer contributions for the provision of necessary educational, social, recreational/leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Proposals are set out in Table 4 in the Transport Chapter for new cycle routes linking the housing sites to the south east of Leighton Buzzard with the Town Centre. Developer contributions will be sought to secure the implementation of these proposals. Further details as to the level of contributions is a matter for the revised Development Brief.

 

Development of this and other Leighton Buzzard housing sites, where indicated in this schedule of guidelines, will require the provision of a new lower school for 300 pupils in an appropriate location which provides safe access to and from the relevant sites. The site chosen should conform to the requirements of the Department for Education and Skills (DfES) and the County Education Authority. Developer contributions will be sought to fund this, where necessary and fairly and reasonably related to the particular development. Developer contributions will also be sought to provide for other educational provision necessary to serve the site.

 

Planning permission will not be granted for proposals which are submitted in advance of the revised Development Brief or which fail to conform to it.

 

Post 2006

16

Weston Avenue Allotments, Linslade

 

 

 

 

No longer allocated.

 

17

Land at Grovebury Farm, Leighton Buzzard

 

17.2 ha

16.0 ha

600 dwellings

Net area reflects the need for landscape treatment along the site boundary adjacent to Leighton Buzzard bypass. Access should be taken from Billington Road with an additional access for emergency service vehicles, public transport, cyclists and pedestrians from Grovebury Road. This is a greenfield site. The site is suitable for medium density development providing not less than 600 dwellings.

 

A Development Brief will be prepared to guide development proposals on this site jointly with the Brickyard Quarry site, Site 31. This will specify amongst other things, the provision of pedestrian and cycle routes within and beyond the site and the level of public transport support required to enable development to take place.

 

The development of the site will generate the need for additional recreational land in this vicinity. An area of mineral workings south of the site is allocated in the plan for recreational use. Most of this area will be occupied by a large lake when mineral extraction is complete. This land is in the same ownership as Site 17. This site will provide sufficient informal open space to meet the requirements of this residential development. Development of the Grovebury Farm site will be subject to the conclusion of a legal agreement which will establish the principle and timing of the development of the mineral working site to the south for appropriate informal recreational uses and arrangements for public access to it. This area of mineral workings is currently part of a wider area of active and disused mineral working sites to the south-west, south-east and north of Leighton, Linslade and Heath and Reach. This is the subject of a sand pits strategy examining the future uses of these areas and the contribution which they can make to the provision of recreational opportunities in adjoining urban areas and the role that they can play in terms of biodiversity. Further details are given in the District Recreational strategy which forms part of the Recreation, Leisure and Open Space chapter of this local Plan.

 

Developer contributions for the provision of necessary educational, social, recreational/leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Proposals are set out in Table 4 in the Transport Chapter for new cycle routes linking the housing sites to the south east of Leighton Buzzard with the Town Centre. Developer contributions will be sought to secure the implementation of these proposals. Further details as to the level of contributions is a matter for the Development Brief.

 

Development of this and other Leighton Buzzard housing sites, where indicated in this schedule of guidelines, will require the provision of a new lower school for 300 pupils in an appropriate location which provides safe access to and from the relevant sites. The site chosen should conform to the requirements of the Department for Education and Skills (DfES) and the County Education Authority. Developer contributions will be sought to fund this, where necessary and fairly and reasonably related to the particular development. Developer contributions will also be sought to provide for other educational provision necessary to serve the site.

 

Planning permission will not be granted for proposals which are submitted in advance of the Development Brief or which fail to conform to it.

 

 

Post 2006

18

Car Storage Site, Grove Road, Slip End

 

 

 

 

Site no longer allocated.

 

 

19

Land at Dunstable Road and Folly Lane, Caddington

 

3.76 ha

2.16 ha

80 dwellings

A 'white' land site in a village excluded from the Green Belt in the 1987 Bedfordshire Structure Plan. The site is well related to village facilities and services. The reduction in the net area reflects the intention to retain that part of the site owned by the Parish Council for community recreation purposes and allotment use. A Development Brief will be prepared for the site to guide development proposals. Planning permission will not be granted for proposals which are submitted in advance of the Brief or which do not conform to it. The site is suitable for a medium density scheme accommodating not less than 80 dwellings. Contributions will also be sought towards the implementation of recreational/leisure facilities in the area. The development will need to incorporate measures to limit the volume or rate of surface water discharge in order to avoid exacerbating local flooding problems.

 

Pre 2006

 

20

Land between Waddington's Yard and White Horse Close, Hockliffe

 

0.81 ha (remaining without planning permission)

0.72 ha (remaining without planning permission)

38 dwellings

Part of brownfield site in village proposed to be excluded from the green belt in this Local Plan. The net area reflects the need to maintain/improve the setting of the listed White Horse Farm. The site is well related to village facilities and services and public transport. A Development Brief will be prepared to guide development on this site. Planning Permission will not be granted for proposals which are submitted in advance of a Brief or which fail to conform to it.

 

Pre 2006

21

A5 Garage, Watling Street, Hockliffe

 

1.06 ha

1.06 ha

40 dwellings

A brownfield site in a village proposed to be excluded from the Green Belt in this Local Plan. Access available from the A5.

 

Post 2006

 

22

Land between Faldo Road and Bedford Road, Barton

 

 

 

 

Site developed.

 

23

Renault Sports Ground, Park Road North, Houghton Regis

 

 

 

 

Site developed.

 

24

Avery's Garage and Land at Rear of 71-81 Plantation Road, Leighton Buzzard

 

0.69 ha

0.69 ha

28 dwellings

Development to take account of the setting of existing houses. A medium density development should be accommodated on the site. Developer contributions for the provision of necessary educational, social, recreational/leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Further detail as to the level of contributions is a matter for the Development Brief. Proposals should include pedestrian/cycle link(s) to connect with those proposed in the vicinity.

 

Pre 2006

 

 

25

 

Land off Baker Street/Rear of 55-69 North Street, Leighton Buzzard

 

 

0.49 ha

 

0.49 ha

 

20 dwellings

 

Development to take account of location on the edge of the Leighton Buzzard Conservation Area and the setting of the listed almshouses in North Street and the Friends Meeting House. The site is close to services and facilities of the Town Centre. It is therefore a site where a low level of parking provision and a high density development would be appropriate. Developer contributions for the provision of necessary educational, social, recreational/ leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Further detail as to the level of contributions is a matter for the Development Brief.

 

 

Post 2006

 

26

Nursery Gardens, Rear of Wing Road, Linslade

 

0.80 ha

0.80 ha

32 dwellings

Development to take account of access difficulties on Wing Road, Linslade and to respond sympathetically to the sensitive canalside location. A Development Brief will be prepared to guide development on the site. The site is close to services and facilities of the Town and well served by public transport. It is therefore a site where low parking provision would be appropriate. Developer contributions for the provision of necessary educational, social, recreational/leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Further detail as to the level of contributions is a matter for the Development Brief. Proposals should include pedestrian/cycle link(s) to connect with those proposed in the vicinity.

 

Post 2006

 

27

Former Railway Sidings, Wing Road, Linslade

 

0.89 ha

0.6 ha

 

24 dwellings

Development to take account of noise generated by the railway, land form and tree cover on site. The site is in close proximity to Leighton Buzzard Railway Station and other public transport provision is available outside the station, this scenario indicates that low car parking provision will be acceptable. Developer contributions for the provision of necessary educational, social, recreational/leisure and community facilities to serve the new development will be sought by means of legal agreements or obligations where appropriate. Further detail as to the level of contributions is a matter for the Development Brief.

 

Post 2006

 

28

Land at Grove Road, Slip End

 

 

 

 

Site no longer allocated.

 

29

Land between Conger Lane and Recreation Ground, Toddington

 

 

 

 

Site no longer allocated

 

30

'The Paddocks', Dunstable

 

 

 

 

Site no longer allocated.

 

 

31

Brickyard Quarry, Leighton Buzzard

 

5.9 ha

5.9 ha

236 dwellings

Greenfield site, partially worked for minerals. Gross and Net site area does not take into account the presence of overhead power lines; the necessary safeguarded area around the power lines will be a matter for the Development Brief to be prepared for the Site in conjunction with the adjacent site, Site 17, Grovebury Farm. The site has good links to nearby employment sites and a recently completed transport assessment has set out the means by which the site and other development sites nearby may be integrated more generally with the rest of Leighton Buzzard. The site needs to be planned and the form and layout of the development designed in conjunction with the Grovebury Farm development (Site 17) immediately adjoining to the south via the implementation of the provision of the joint Development Brief mentioned above. Access will be taken from Grovebury Road. The site is suitable for medium density development with an overall density not less than 37 dwellings per hectare.

 

Developer contributions will be sought for education, leisure/recreation and community facilities provision to serve development on site, these will be sought by means of legal agreements or obligations where appropriate. Proposals are set out in Table 4 in the Transport Chapter for new cycle routes linking the housing sites to the south-east of Leighton Buzzard with the Town Centre. Developer contributions will be sought to secure the implementation of these proposals. Further details as to the level of contributions will be a matter for the Development Brief. Proposals should include pedestrian/cycle link(s) to connect with those proposed in the vicinity. A substantial provision of affordable housing will be sought on this site.

 

Development of this and other Leighton Buzzard housing sites, where indicated in this schedule of guidelines, will require the provision of a new lower school for 300 pupils in an appropriate location which provides safe access to and from the relevant sites. The site chosen should conform to the requirements of the Department for Education and Skills (DfES) and the County Education Authority. Developer contributions will be sought to fund this, where necessary and fairly and reasonably related to the particular development. Developer contributions will also be sought to provide for other educational provision necessary to serve the site.

 

Planning permission will not be granted for proposals submitted in advance of the Development Brief or which fail to conform to it.

 

Post 2006

 

 

NOTE:

Sites 1-21 & Site 31    are additional housing allocations, (Site 30 was proposed to be allocated at modification stage, this allocation was then deleted as part of a set of further proposed modifications).

 

Sites 22-29      are allocations in the adopted South Bedfordshire Local Plan, 1995, which have not yet been implemented.

 

The schedule gives both gross and net site areas in hectares. The net area is derived by taking site characteristics into account and the need for parts of sites to be kept free of development for strategic landscaping, buffer zones etc.

'Fall-in' Sites

6.21     As indicated in the footnote to Table 5 of this Plan, monitoring has indicated that a significant contribution to housing requirements comes from small sites (up to 0.4 hectares) not identified in local plans, through redevelopment, conversion, site amalgamation, etc.

 

6.22     Additionally, urban sites of more than 0.4 hectares in size which were not identified for development, have in the past come forward and contributed usefully to the supply of housing land. In many cases these have been brownfield sites previously in industrial storage or commercial use where the development has resulted in an environmental improvement.

 

6.23     In preparing the Schedule of Sites at H1 in this Plan, the District Planning Authority examined all vacant urban sites of 0.4 hectares and above with a view to allocating them for residential development. In addition, urban sites put forward by landowners or their agents were also considered. Where appropriate, these sites have been proposed for residential development in this local plan review. However, the District Planning Authority is aware that there are a large number of existing employment sites in urban areas - not within the Main Employment Areas defined in this Plan - which may become vacant or underused during the period of this Plan and where residential development could take place. An Urban Housing Capacity Study has been undertaken by the Council and this was approved for publication in September 2003. This study identifies many such residential opportunities.

 

6.24     The District Planning Authority has not generally sought to allocate any such sites in this Plan or attempted to estimate the scale of contribution which they might make during the Plan period. However, it is likely that a valuable contribution will continue to be made by 'fall-in' sites both large and small, and the District Planning Authority recognises that such sites are frequently well suited to meeting the needs of local households because of their scale and location. Accordingly:

 

 

POLICY H2

 

WITHIN BUILT UP AREAS EXCLUDED FROM THE GREEN BELT PROVISION OF NEW HOUSING BY DEVELOPMENT OF INFILL SITES; REDEVELOPMENT; CONVERSION AND RE-USE OF BUILDINGS; AND SUB-DIVISION OF LARGE RESIDENTIAL PROPERTIES IN ACCORDANCE WITH POLICY H9 WILL BE APPROVED WHERE IT WOULD:

 

(i)        MAKE EFFICIENT USE OF THE SITE OR BUILDING IN TERMS OF DENSITY AND LAYOUT;

 

(ii)       NOT RESULT IN LOSS OF OPEN SPACE OF RECREATIONAL OR AMENITY VALUE OR POTENTIAL;

 

(iii)      RESPECT AND ENHANCE THE CHARACTER OF THE SURROUNDING AREA;

 

(iv)      PROVIDE GOOD QUALITY LIVING CONDITIONS FOR RESIDENTS;

 

(v)       BE READILY ACCESSIBLE TO PUBLIC TRANSPORT AND LOCAL SERVICES;

 

(vi)      BE ACCEPTABLE IN TERMS OF HIGHWAY SAFETY AND TRAFFIC FLOW;

 

(vii)     NOT RESULT IN UNACCEPTABLE LOSS OF EMPLOYMENT LAND; AND

 

(viii)    NOT UNACCEPTABLY CONSTRAIN DEVELOPMENT OF ADJOINING LAND FOR AN ALLOCATED OR PERMITTED USE.

 

NOTE 1:           Reference to re-use of buildings in this Policy covers the bringing back into residential use of existing housing such as accommodation over shops and commercial premises where this is subject to planning control.

 

NOTE 2:           Town cramming is dealt with in paragraph 4.41-4.48 of this Plan.

Meeting Local Housing Needs

6.25     Population and household forecasts carried out by Bedfordshire County Council for the Bedfordshire Structure Plan 2011 indicate that the number of households in South Bedfordshire is likely to increase by about 6,400 between 1996 and 2011.

 

6.26     Within this overall increase, there are areas of change in the proportion of households of different types. The details of these changes are set out in Table 6.

 

6.27     An analysis of Table 6 shows that the trend towards smaller households and a preponderance of elderly person households is likely to continue. It indicates that housing provision in the District should be related as far as possible to the main areas of need which can be readily discerned from the Table.

 

6.28     However, the number of married couple households is also forecast to increase significantly, although the proportion of all households in this category will reduce. Single person households are forecast to increase by 3,267 (27.6%) during the Plan period, and by 2011 almost 30% of all households will be in this category. A substantial proportion of these (7,277) will be elderly persons living alone. By 2011 it is estimated that well over half of these elderly single person households (4,303) will be over 75.

 

6.29     It is essential to try to match new house building in the District to the types of forecast housing need revealed in Table 6. There is likely to be a substantially increasing requirement for sheltered housing for the elderly as well as small dwellings for the single elderly, other single person households and small lone parent families. On the other hand, the requirement for a large proportion of new units to be family accommodation (i.e. 3, 4 bedroom or larger houses) is not indicated.

 

TABLE 6        HOUSEHOLD CHANGE – COMPONENTS OF HOUSING NEED IN SOUTH BEDFORDSHIRE 1996-2001

 

Household

Type

No. & % of Total Households

Numerical Increase & % of Total Increase

%

Increase

 

ALL HOUSEHOLDS

 

Married Couple

 

 

 

25,120

55.53%

 

 

 

27,768

53.78%

 

 

 

2,648

41.37%

 

 

 

 

10.54%

Cohabiting Couple

3,001

6.63%

 

2,844

5.51%

-157

-

Lone Parent

 

2,101

4.64%

 

2,116

4.10%

 

15

0.23%

0.07%

Single Person

11,841

26.18%

 

15,108

29.26%

 

3,267

51.05%

27.60%

 

Other

3,172

7.01%

 

3,799

7.36%

 

627

9.80%

 

19.77%

 

 

ELDERLY HOUSEHOLDS

 

E.P. (Married Couple)

 

 

 

 

4,119

9.11%

 

 

 

 

5,591

10.83%

 

 

 

1,472

23.00%

 

 

 

 

35.74%

 

E.P. (Cohabiting Couple)

77

0.17%

 

100

0.19%

 

23

0.36%

 

29.87%

 

Elderly Lone Parent

 

10

0.02%

 

14

0.03%

 

4

0.06%

 

40%

 

Elderly Single Person

 

5,179

11.45%

 

7,277

14.09%

 

2,098

32.78%

 

40.05%

 

E.P. (Other)

717

1.59%

 

685

1.33%

 

-32

 

-

 

 

All Elderly Person

Households

 

10,102

22.33%

 

 

13,667

26.47%

 

 

3,565

55.70%

 

 

35.30%

 

All Households

45,235

 

51,635

6,400

 

14.15%

 

 

Source: Beds County Council Household Formation Projections.

 

 

6.30     The District Planning Authority is concerned to ensure that new house building in the District makes a substantial contribution to meeting locally generated housing requirements by the provision of accommodation suitable for the elderly, for single and other small households. Such provision will require a significant proportion of new housing development to be 1 and 2 bedroom units.

 

6.31     This approach is supported by Government guidance in PPG3 which calls for a reasonable mix and balance of housing types and sizes. It is therefore proposed that a requirement of not less than 33% of units in any development should be 1 and 2 bedroom accommodation to ensure that the needs of small households are met. This is a reasonable minimum given that the growth in single person households is expected to be 51% of total household growth. The District Planning Authority will continue to monitor need for smaller households on a regular basis throughout the plan period. Accordingly:

 

POLICY H3

 

WHEN CONSIDERING PLANNING APPLICATIONS FOR RESIDENTIAL DEVELOPMENT ON SITES LISTED IN POLICY H1 OF THIS PLAN OR ELSEWHERE WITHIN THE BUILT-UP AREAS OF THE DISTRICT EXCLUDED FROM THE GREEN BELT:

 

A.        THE DISTRICT PLANNING AUTHORITY WILL EXPECT THE DEVELOPMENT TO CONTRIBUTE TO MEETING THE NEEDS OF THE ELDERLY, SINGLE AND OTHER SMALL HOUSEHOLDS.

 

B.         THE PROPORTION OF 1 OR 2 BEDROOMS TO BE PROVIDED IN RESIDENTIAL DEVELOPMENT SHOULD BE NOT LESS THAN 33% OF THE TOTAL DWELLING PROVISION. EXCEPTIONS MAY BE MADE WHERE THE RIGID APPLICATION OF THIS POLICY WILL BE INAPPROPRIATE IN THE CONTEXT OF THE NATURE AND CHARACTER OF THE SITE AND ITS SURROUNDINGS.

The Provision of Affordable Housing

6.32     Both PPG3 and Circular 6/98 'Planning and Affordable Housing' state that a community's need for affordable housing is a material planning consideration. The District Council has commissioned Housing Needs Surveys which have demonstrated that many local residents are unable to afford housing at market rates despite the recent provision of smaller units at higher densities in many locations in the District. There is strong evidence that many local residents are unable to compete in the housing market with in-migrants from higher priced housing areas. This has caused problems of accessibility to housing which have been exacerbated by low levels of availability of affordable private rented housing in the District, the absence of new local authority housing and the supply of new social housing falling behind losses of Council housing through the 'Right to Buy' provisions.

 

6.33     The results of the Council's District-wide Housing Needs Survey indicated high levels of housing expectation which were not backed up by the ability to buy into the housing market. The most recent District-wide Housing Needs Survey - published in March 2000 - concluded that while there was more than adequate supply to meet the overall housing requirements in South Bedfordshire, there was a large shortfall of affordable accommodation in both the rented and the 'for sale' sectors. The Fordham Housing Needs Survey, (March 2000), indicates that an additional 4,300 homes are required to 2011 if the Council is to meet all of the current and projected affordable housing need. In 1999 the survey indicated that 2,151 affordable homes were needed. Average annual household income in South Bedfordshire in 2002 was £24,333 but the average income needed to secure a property was £43,483.

 

6.34     The results of this survey and future similar surveys, together with the Council's Housing Register (which indicates a significant need for affordable rented accommodation throughout the District), have been and will continue to be used to identify the level of affordable housing required in the various parts of the District.

 

6.35     The District Council recognises that the precise level of requirement for affordable housing will change over time and from area to area. The figures set down in this plan are intended to inform land owners and potential developers of the level of provision of affordable housing that they will be expected to meet in South Bedfordshire.

 

6.36     The Fordham Housing Needs Survey indicated that 4,300 affordable homes would be needed in South Bedfordshire District between 1999 and 2011, of that 4,300 the consultants estimated that 2,151 households were in immediate or urgent need of affordable housing, equating to 60% of the housing provision still to be made in the District up to 2011. Analysis of the Council's Housing Register indicates that 655 households are categorised as being in priority need, including those households that are homeless; those that are in overcrowded accommodation or accommodation that lacks facilities, or where facilities such as bathrooms, cooking facilities or internal WCs have to be shared. This figure tends to confirm the Fordham Housing Needs Survey finding that 67.6% of existing households in housing need will not be known to the Council because they do not appear on the Council's Housing Register. The Fordham Housing Needs Survey recommends that the level of housing need identified in South Bedfordshire warrants seeking 30% contribution on suitable sites. Given the scale of housing need, the capacity of sites allocated for development in the plan, together with the possibility of some larger windfall sites coming forward for development and taking account of the level of contribution likely to be made by low cost market housing, the Council's own housing stock and other sources of housing provision, the District Planning Authority considers that it is justified in seeking the provision of not less than 20% of affordable housing on suitable sites. This indicative target figure is intended to form a basis for negotiation with developers. Suitable sites will normally be over 1 hectare in size or will accommodate 25 or more dwellings, and comply with the criteria set out in the policy.

 

6.37     Sites which are smaller than 1 hectare but which are capable of accommodating 25 or more dwellings are of particular value in terms of affordable housing provision because they tend to be located within existing urban areas rather than on their fringes, and to be well related to public transport routes and have ready access to a wide range of services and facilities without the use of a private vehicle. These are also sites which the District Planning Authority considers are likely to come forward earlier in the plan period than the larger fringe or urban edge sites – where lead times to development may be lengthy – thereby enabling the supply of affordable housing to be maintained throughout the plan period.

 

6.38     Any developer or landowner contemplating the purchase or development of either an allocated housing site (see Policy H1 of this plan and the accompanying schedule), or a site to be used for housing purposes is strongly advised to make early contact with the District Planning Authority to identify the full proportion of affordable housing needed in a particular location and to discuss the appropriate unit mix, tenure, type and acceptable registered social landlords.

 

6.39     For the purposes of this section of the Plan and Policy H4 which follows, the District Planning Authority defines affordable housing as that which meets the need of:

 

(a)       Households with a gross household income which is less than 1/3 of their mortgage requirement; or

 

(b)       Households in, or requiring, privately rented accommodation where this would take up more than 35% of their gross income.

 

This definition of affordable housing includes low cost market housing that meets the test of affordability.

 

6.40     In this context the relevant mortgage requirement or rent level is for a dwelling of the size needed by the household in question in accordance with the District Housing Authorities occupancy definitions.

 

6.41     Planning obligations will be sought to secure the 20% indicative target level of affordable housing provision on sites of 1 hectare or over or where 25 or more dwellings are proposed.

 

POLICY H4

 

PROVISION OF AFFORDABLE HOUSING WILL BE SOUGHT ON ALL SUITABLE RESIDENTIAL SITES, NAMELY THOSE:

 

(i)        SITES OF 1 HA OR MORE IN SIZE, OR WHERE ERECTION OF 25 OR MORE DWELLINGS IS PROPOSED; AND

 

(ii)       THAT CAN ACCOMMODATE AN APPROPRIATE MIX OF TYPES AND SIZES OF HOUSING; AND

 

(iii)      THAT ARE SUITABLE IN TERMS OF LOCATION, ACCESS TO LOCAL FACILITIES, SERVICES AND PUBLIC TRANSPORT; AND

 

(iv)      WHERE PROVISION OF AFFORDABLE HOUSING WOULD NOT PREVENT IMPLEMENTATION OF THE PROPOSAL, OR REALISATION OF OTHER PLANNING OBJECTIVES THAT SHOULD BE GIVEN HIGHER PRIORITY.

 

THE LEVEL AND TYPE OF AFFORDABLE HOUSING TO BE PROVIDED ON A PARTICULAR SITE WILL BE A MATTER FOR NEGOTIATION BETWEEN THE COUNCIL AND THE DEVELOPER, TAKING INTO ACCOUNT THE INDICATIVE TARGETS SET IN THIS PLAN, AND THE NATURE OF THE PROPOSED DEVELOPMENT. PLANNING OBLIGATIONS WILL BE SOUGHT, OR CONDITIONS APPLIED TO PLANNING PERMISSIONS, TO ENSURE THAT AFFORDABLE HOUSING IS PROVIDED, AND THAT INITIAL AND SUBSEQUENT OCCUPANCY IS RESTRICTED TO PEOPLE IN NEED OF SUCH HOUSING IN SOUTH BEDFORDSHIRE. PROVISION CAN BE SECURED BY THE TRANSFER TO THE DISTRICT COUNCIL, OR SOCIAL HOUSING AGENCY(1) NOMINATED BY THEM, OF DISCOUNTED LAND; OR BY MAKING AVAILABLE COMPLETED DWELLINGS TO OCCUPIERS NOMINATED BY THE DISTRICT COUNCIL. IN EXCEPTIONAL CASES, AS AN ALTERNATIVE IT MAY BE ACCEPTABLE FOR THE DEVELOPER TO MAKE AN EQUIVALENT CONTRIBUTION IN CASH TO THE DISTRICT COUNCIL, TO ENABLE PROVISION OF AFFORDABLE HOUSING ON AN ALTERNATIVE SITE.

 

FOR THE PURPOSES OF THIS POLICY, AFFORDABLE HOUSING IS DEFINED AS THAT WHICH IS OF THE SIZE AND TYPE REQUIRED TO MEET THE NEEDS OF HOUSEHOLDS WHERE:

 

(i)        GROSS HOUSEHOLD INCOME IS LESS THAN 1/3 OF MORTGAGE REQUIREMENT; OR

 

(ii)       RENTING PRIVATELY WILL TAKE MORE THAN 35% OF GROSS HOUSEHOLD INCOME.

 

NOTE:

(1)       Social Housing Agency means a housing association or Registered Social Landlord registered by the Housing Corporation.

 

(2)       The District Council will regularly monitor the need for affordable housing in the District. The level of need and tenure preference is likely to vary over time and from location to location. Working from the basis of the guidelines in this plan, the most up to date data available will be used to determine the precise number of affordable dwellings needed in a particular location or on a particular site. Landowners and developers are advised to make early contact with the District Planning Authority to discuss the appropriate level of affordable housing provision and mechanism to secure it.

 

 

6.42     The District Planning Authority recognises that there may be a need for affordable housing in rural settlements where no provision is likely to be forthcoming through the mechanisms set out at Policy H4. Therefore:

 

 

POLICY H5

 

AS AN EXCEPTION TO THE RESTRICTIVE RURAL SETTLEMENT POLICIES ON GENERAL RESIDENTIAL DEVELOPMENT WHICH APPLY TO VILLAGES IN SOUTH BEDFORDSHIRE, THE DISTRICT PLANNING AUTHORITY MAY GRANT PLANNING PERMISSION FOR SMALL RESIDENTIAL DEVELOPMENTS WHICH PROVIDE AFFORDABLE HOUSING TO MEET SPECIFIC LOCAL HOUSING NEEDS WHICH CAN ONLY BE MET IN A PARTICULAR LOCATION AND WHICH CANNOT BE ACCOMMODATED IN ANY OTHER WAY. TO BE ACCEPTABLE SUCH DEVELOPMENTS MUST USUALLY:

 

(i)        BE ON SITES WITHIN VILLAGES AND MUST BE CAPABLE OF BEING WELL INTEGRATED WITH THE EXISTING PATTERN AND SCALE OF SETTLEMENT AND LAND USE IN THE AREA.

 

(ii)       COMPRISE SMALL SCHEMES OF NO MORE THAN TEN DWELLINGS.

 

(iii)      PROVIDE HOUSING FOR RENT AND/OR SHARED EQUITY WITHOUT THE RIGHT TO 'STAIRCASE' TO 100% OWNERSHIP. PROPOSALS WHICH ONLY INVOLVE A DISCOUNTED INITIAL PRICE OR WHICH DEPEND ON CROSS SUBSIDISATION FROM OPEN MARKET HOUSING WILL NOT BE CONSIDERED ACCEPTABLE.

 

(iv)      BE SUPPORTED BY THE RESULTS OF SURVEYS OR OTHER INFORMATION DEMONSTRATING THAT THERE IS A NEED WITHIN THE LOCAL COMMUNITY FOR SUCH A SCHEME AND THAT THE PROPOSAL IS ECONOMICALLY VIABLE.

 

(v)       BE SUBJECT TO A LEGAL AGREEMENT ESTABLISHING A MECHANISM FOR THE MANAGEMENT OF THE SCHEME BY, FOR EXAMPLE, A HOUSING ASSOCIATION, VILLAGE TRUST, OR SIMILAR ORGANISATION WHICH WILL ENSURE THAT INITIAL AND SUBSEQUENT OCCUPANCY IS RESTRICTED TO PEOPLE IN HOUSING NEED WITH A STRONG DEMONSTRABLE LOCAL CONNECTION.

 

(vi)      BE COMPLEMENTARY IN LAYOUT AND DESIGN TO THE CHARACTER OF THE VILLAGE CONCERNED. PROPOSALS WILL ALSO BE SUBJECT TO THE REQUIREMENTS OF PLANNING POLICIES FOR DEVELOPMENT IN RURAL AREAS GENERALLY AND, WHERE APPROPRIATE, TO THE PARTICULAR POLICIES WHICH APPLY IN THE CHILTERNS AREA OF OUTSTANDING NATURAL BEAUTY, THE AREAS OF GREAT LANDSCAPE VALUE AND CONSERVATION AREAS. ACCOUNT WILL ALSO BE TAKEN OF THE EFFECTS ON INFRASTRUCTURE, SERVICES AND ROAD TRAFFIC CONDITIONS.

 

NOTE:

Justification – It is important to be clear that the above Policy refers to specific local housing needs, i.e. those cases where there are very special circumstances which could justify releasing land that would not normally be allocated to meet general housing demand in order to house people with strong demonstrable local connections whose housing needs cannot be met elsewhere.

 

Affordability – The essence of an exception to policy which will allow for housing development on land which would not normally be released for such purposes is that the housing provided should be limited to local people who are genuinely unable (not just unwilling) to afford housing in the local market including both owner-occupied and rented accommodation. Local market conditions and wage rates will have to be examined in order to assess whether local people can afford accommodation in their village or parish and to determine what level of payment would be within their means. Considerable variations in house prices and earnings between different areas and over time mean that there can be no single 'once and for all' definition of what constitutes affordable housing. This highlights the need for specific local surveys in order to assess the need and scope for schemes before embarking on proposals. Normally, however in order for a scheme to be acceptable, the sale price of any property provided should not exceed 70% of the open market value of similar property in the local area. If the scheme involves the provision of rented accommodation rents should be set at no more than 60% of market rates.

 

Local Needs – Similar considerations apply to the assessment of local needs. For the purposes of this policy however, local relates to the parish rather than the individual village and 'strong demonstrable local connection' means people who have lived in the parish for five out of the last ten years or who have very close family members (i.e. parents, son or daughter) who live or work in the parish. For example:

 

(a)           Existing residents who need separate accommodation such as newly married couples or people leaving tied housing on retirement or redundancy.

 

(b)           People whose work provides important local services and who need to live within the local community.

 

(c)           People who are not currently resident in the parish, but who have long standing links with the area such as the children of local residents or elderly people who need to move back to the area to be near relatives.

 

(d)           People with the offer of a job in the locality who cannot take up the offer because of an inability to buy into the local housing market.

 

The term 'specific local housing need' should not be construed to mean housing demand, whether on a local, district or countywide basis. The release of sites to secure the provision of housing to meet specific local housing needs under the terms of the policy will, therefore, be additional to the provision made in local plans for general housing demand.

 

The District Planning Authority accepts that there may be scope for a limited number of housing schemes which extend the choice of house types and tenures available in the rural area. The Authority also recognises the need to avoid prejudicing its other policies and will, therefore, implement this policy with caution.

 

It is strongly recommended that any proposals are discussed with the District Planning Authority at an early stage and that applicants obtain an informal opinion from the District Planning Authority as to the suitability of the site selected.

Housing Density

6.43     The District Planning Authority recognises that because the supply of land for residential development in South Bedfordshire is limited, it is necessary to make efficient use of the land that is available. This requires that residential development takes place at densities which maximise the provision of housing while maintaining high standards of design and environmental quality. The District Planning Authority sees no conflict between these objectives.

 

6.44     There are many examples in South Bedfordshire of well designed housing schemes which are compatible with their surroundings and appropriate to their site at densities well in excess of 37 dwellings per hectare. Many of the sites identified in this plan for residential development are suitable for development at such densities. This is particularly the case where urban sites with high accessibility and low car parking requirements are concerned. The District Council remains convinced of the need to make good use of housing sites, because of land supply constraints. Therefore:

 

POLICY H6

 

EFFECTIVE USE OF RESIDENTIAL LAND WILL BE SOUGHT BY ENSURING THAT RESIDENTIAL DEVELOPMENT TAKES PLACE AT AS HIGH A DENSITY AS IS BOTH COMPATIBLE WITH THE CHARACTERISTICS OF THE SITE AND ITS SURROUNDINGS AND CONSISTENT WITH ANY NEED TO PROVIDE AMENITY OPEN SPACE, LANDSCAPING OR PLAY AREAS. IN AREAS OF HIGH ACCESSIBILITY BY/TO MODES OF TRANSPORT OTHER THAN THE PRIVATE CAR, HIGHER DENSITY DEVELOPMENT WITH LOW LEVELS OF CAR PARKING PROVISION WILL BE SOUGHT.

Loss of Residential Accommodation

6.45     The housing requirements for South Bedfordshire set down in the Bedfordshire Structure Plan 2011 are expressed in net terms. The effect of this is to require the provision of an additional dwelling for every one lost through redevelopment, demolition or change of use. This clearly has implications for the supply of land as relatively few additional opportunities exist to make good losses from the existing housing stock. At the same time it is important to ensure that land which is allocated for residential purposes is not lost to other uses.

 

6.46     In certain parts of the District and particularly in the town centres and older mixed use areas of Dunstable, Leighton Buzzard, Linslade and the larger villages, there is considerable pressure for the change of use of residential accommodation to retail, office, commercial and other uses. In town centres this is particularly related to dwellings above commercial premises. The District Planning Authority is convinced that residential accommodation in such areas plays an important part in meeting the need for small and inexpensive dwellings particularly suitable for the young, single and small newly formed households at the lower end of the housing market. It also contributes to the life and vitality of the area and has security and public safety benefits. Some such opportunities are highlighted in the District's Urban Housing Capacity Study, published in September 2003. Given the nature of locally generated housing requirements and the constraints on outward expansion, the District Council wishes to maintain the existing housing stock as far as possible. Therefore:

 

POLICY H7

 

PLANNING PERMISSION WILL NOT BE GIVEN FOR DEVELOPMENT WHICH WOULD RESULT IN THE LOSS OF RESIDENTIAL LAND OR BUILDINGS OR FOR REDEVELOPMENT OR CHANGE OF USE OF RESIDENTIAL ACCOMMODATION FOR NON-RESIDENTIAL PURPOSES WHERE THIS WOULD REPRESENT AN UNACCEPTABLE LOSS TO HOUSING STOCK.

Extensions to Residential Properties

6.47     Many extensions to residential properties do not need planning permission. They are permitted by virtue of the Town and Country Planning (General Permitted Development) Order 1995, as amended. However, when planning permission is required, the proposal will need to be considered against a number of criteria which are set out in Policy H8.

 

6.48     It is particularly important that extensions to properties should be designed so that they appear as a composite part of the overall building rather than an afterthought. In addition, they should not adversely affect the amenities of surrounding residential properties and should respect the overall character of the site and its surroundings. More specifically, the District Council is of the view that there should be a minimum of 1 metre between any two storey extension and the property boundary so as to retain an appropriate degree of separation.

 

POLICY H8

 

EXTENSIONS TO DWELLINGS WILL BE PERMITTED IF:

 

(i)        THE EXTENSION IS WELL RELATED TO THE EXISTING BUILDING IN TERMS OF ITS DESIGN, SITING, BULK, FENESTRATION AND USE OF MATERIALS AND LEAVES SUFFICIENT SPACE FOR PRIVATE GARDENS AND OFF STREET PARKING.

 

(ii)       THE SITING, SIZE AND DESIGN OF THE EXTENSION DOES NOT RESULT IN ANY SIGNIFICANT OVERSHADOWING OR LOSS OF DAYLIGHT, SUNLIGHT, PRIVACY OR VISUAL AMENITY TO NEIGHBOURING PROPERTIES AND THEIR RESIDENTS.

 

(iii)      THE DESIGN OF THE PROPOSED EXTENSION TAKES FULL ACCOUNT OF THE CHARACTER OF THE SITE AND ITS SURROUNDINGS AND THE SETTING OF THE EXISTING BUILDING INCLUDING WHERE APPROPRIATE THE RETENTION OF ADEQUATE SEPARATION BETWEEN BUILDINGS.

 

NOTE:

Supplementary planning guidance for householders considering extending their property is available separately and sets out in more detail the factors the District Planning Authority will take into account when assessing proposed extensions. This should be consulted before submitting an application.

Conversion of property to provide additional residential units

6.49     It is recognised that in urban areas and the larger villages the conversion or sub-division of suitable properties to provide additional units can be an important source of dwellings and a means of adapting the existing housing stock to meet the changing needs of the population. There is, however, a need to protect the amenities and privacy of neighbouring properties and the character of residential areas when such development is proposed.

 

6.50     Particular concern has arisen over proposals for the sub-division of homes to form flats where the original property does not readily lend itself to this type of conversion. Conversion of such property can result in noise transfer between dwellings, pressure for on-street parking, and the loss of amenities for occupants and neighbours. Accordingly:

 

POLICY H9

 

THE CONVERSION OF PROPERTY TO PROVIDE ADDITIONAL RESIDENTIAL ACCOMMODATION WILL BE PERMITTED WHERE:

 

(i)        THE BUILDING AND ITS PLOT ARE OF SUITABLE SIZE AND LAYOUT FOR CONVERSION AND ARE NOT LOCATED WITHIN AN AREA OF PREDOMINANTLY SINGLE FAMILY DWELLINGS OF A TERRACED, SEMI-DETACHED OR SMALL DETACHED TYPE.

 

(ii)       SATISFACTORY PROVISION IS MADE FOR LANDSCAPED AMENITY SPACE, PARKING AND OTHER SERVICES IN APPROPRIATE LOCATIONS, HAVING REGARD TO ANY STANDARDS SET OUT IN SUPPLEMENTARY PLANNING GUIDANCE.

 

(iii)      NUISANCE TO NEIGHBOURING PROPERTIES WILL NOT OCCUR AND THERE IS A SATISFACTORY SEPARATION, PRIVACY AND NOISE INSULATION BETWEEN THE PROPOSED NEW UNITS THEMSELVES AND ANY NEIGHBOURING PROPERTIES WHICH MAY BE ADVERSELY AFFECTED BY OVERLOOKING OR NOISE DISTURBANCE.

 

(iv)      ANY LIVING ACCOMMODATION PROPOSED FOR BASEMENT AREAS HAS ADEQUATE SELF CONTAINED ACCESS AND NATURAL DAYLIGHT TO HABITABLE ROOMS.

 

(v)       EXTENSIONS WHICH ARE NECESSARY FOR THE CONVERSION ARE IN ACCORDANCE WITH POLICY H8 TO MINIMISE THEIR IMPACT ON THE BUILDING, NEIGHBOURING PROPERTIES AND THE WIDER AREA.

 

NOTE:

Supplementary planning guidance relating to conversions of properties into flats is available separately and sets out in more detail the factors the District Planning Authority will take into account when assessing proposed conversions. In addition, all applications are required to conform to the Building Regulations, the Public Health Act and Fire and Safety Regulations.

Residential Development in the Green Belt

6.51     Policy GB1 of this plan states that planning permission will not be granted for development for inappropriate uses in the Green Belt except in very special circumstances. General residential development falls into this category and will normally be resisted by the District Planning Authority. However, new houses may be acceptable in the Green Belt in the following circumstances:

 

● where need has been established for an agricultural workers dwelling or farm dwelling;

 

● to meet a specialised local housing need; and

 

● infilling in Category 2 villages listed in Policy GB3 of this plan, within boundaries defined on the Proposals Map.

 

Agricultural or Farm Dwellings

 

6.52     Despite trends towards diversification of uses of agricultural land and reductions in the acreage of actively farmed land, agriculture remains a major land use in the rural areas of the District. In some circumstances the nature of the agricultural activity may give rise to the need for additional residential accommodation for essential farm workers. Normally the District Planning Authority will expect such workers to be accommodated within existing settlements. However, there may be exceptional circumstances where a case will be made for a departure from normal Green Belt policy to provide additional residential accommodation on the farm holding and outside an existing settlement. The District Planning Authority is of the view that such development will rarely be justified. Therefore:

 

POLICY H10

 

WITHIN THE GREEN BELT THE DISTRICT PLANNING AUTHORITY WILL ONLY GRANT PLANNING PERMISSION FOR AN AGRICULTURAL WORKERS DWELLING OR FARM DWELLING WHERE:

 

(i)        THE PROPOSED DWELLING IS ESSENTIAL TO THE AGRICULTURAL EFFICIENCY OF THE BUSINESS TO WHICH IT RELATES.

 

(ii)       THE AGRICULTURAL BUSINESS GIVING RISE TO THE CLAIMED NEED FOR A NEW DWELLING HAS BEEN ESTABLISHED FOR AT LEAST 3 YEARS AND PROFITABLE FOR AT LEAST ONE OF THOSE YEARS AND WHICH CAN EXPECT TO REMAIN PROFITABLE IN THE FUTURE AT A LEVEL WHICH WOULD SUSTAIN THE PROVISION OF THE AGRICULTURAL DWELLING PROPOSED.

 

(iii)      THE AGRICULTURAL NEED FOR THE DWELLING RELATES EITHER TO A FULL TIME WORKER OR A PERSON PRIMARILY EMPLOYED IN AGRICULTURAL WORK ON THE FARM HOLDING.

 

(iv)      THERE IS NO SUITABLE ALTERNATIVE ACCOMMODATION AVAILABLE ON THE FARM HOLDING OR ELSEWHERE IN THE NEIGHBOURHOOD.

 

(v)       THERE ARE NO REDUNDANT FARM BUILDINGS WHICH COULD BE CONVERTED TO AN AGRICULTURAL OR FARM DWELLING ON THE HOLDING.

 

(vi)      THE SIZE, SETTING AND APPEARANCE OF THE PROPOSED DWELLING ARE WELL RELATED TO THE REASONABLE REQUIREMENTS OF THE PROPOSED OCCUPIER AND TO THE EXISTING BUILDINGS ON THE FARM HOLDING.

 

(vii)     THE PROPOSED DWELLING HAS NO ADVERSE IMPACT ON BIODIVERSITY, WILDLIFE OR THE APPEARANCE OR AMENITY OF THE COUNTRYSIDE.

 

(viii)    THE PROPOSED DWELLING IS OF A SIZE AND NATURE COMMENSURATE WITH THE FUNCTIONAL AGRICULTURAL PURPOSE IT IS REQUIRED TO MEET.

 

IN THE FIRST INSTANCE PLANNING PERMISSION MAY ONLY BE GRANTED FOR A MOBILE HOME OR RESIDENTIAL CARAVAN FOR A TEMPORARY PERIOD TO TEST THE ECONOMIC VIABILITY OF THE AGRICULTURAL BUSINESS.

 

WHERE PLANNING PERMISSION IS GRANTED, CONDITIONS WILL BE IMPOSED TO ENSURE THAT THE FIRST OCCUPATION OF THE DWELLING IS LIMITED TO A PERSON SOLELY, OR MAINLY EMPLOYED IN AGRICULTURE OR FORESTRY ON THE LAND HOLDING TO WHICH THE DWELLING RELATES. THE DWELLING MAY ALSO BE OCCUPIED BY SUCH A PERSON DURING THEIR SUBSEQUENT RETIREMENT OR BY A DEPENDENT RESIDING WITH SUCH A PERSON OR BY THE WIDOW OR WIDOWER OF SUCH A PERSON.

 

FURTHER CONDITIONS MAY BE IMPOSED WHICH REMOVE PERMITTED DEVELOPMENT RIGHTS FOR EXTENSIONS AND INCIDENTAL BUILDINGS.

 

A PLANNING OBLIGATION MAY BE SOUGHT WHERE ADDITIONAL CONTROL IS NECESSARY AND JUSTIFIED.

 

 

6.53     The first occupation of a dwelling permitted under this policy should be by the applicant or other person named in the planning application.

 

6.54     In circumstances where agricultural activity on the holding ceases permanently and the dwelling becomes vacant the District Planning Authority will bear in mind the need for affordable housing in the locality when considering any application to vary a condition or agreement on occupancy imposed or concluded under Policy H10.

 

6.55     In South Bedfordshire concern has frequently been expressed over the requirements for new agricultural workers or farm dwellings arising from the splitting or sub-division of farm units, or in circumstances where a farm holding is sold without its farmhouse or agricultural workers dwellings. The proliferation of new dwellings in the countryside arising from these circumstances is considered by the District Planning Authority to constitute a threat to the maintenance of the Green Belt and the protection of the countryside and to undermine public confidence in Green Belts. In certain circumstances the exercise of permitted development rights may have an adverse effect on the openness of the Green Belt and/or its visual amenities. Where the District Planning Authority considers that this would be unacceptable it may seek to remove such development rights by conditions or through a planning obligation. Accordingly:

 

 

POLICY H11

 

A.        THE PROVISION OF NEW AGRICULTURAL WORKERS DWELLINGS OR FARM DWELLINGS WILL NOT BE PERMITTED FOLLOWING THE SPLITTING OR SUB-DIVISION OF A FARM HOLDING UNLESS THE DISTRICT PLANNING AUTHORITY IS SATISFIED THAT SUCH SPLITTING OR SUB-DIVISION IS ESSENTIAL TO MAINTAIN THE ECONOMIC VIABILITY AND AGRICULTURAL EFFICIENCY OF THE HOLDING AS A WHOLE AND THAT THERE IS SOUND AGRICULTURAL JUSTIFICATION FOR SUCH A CHANGE AND FOR THE PROPOSED DWELLINGS. IN THOSE CASES WHERE THE DISTRICT PLANNING AUTHORITY IS SATISFIED, THE PROVISIONS OF POLICY H10 WILL ALSO NEED TO BE MET IN FULL.

 

B.         THE DISTRICT PLANNING AUTHORITY WILL RESIST ANY PROPOSAL FOR DEVELOPMENT WHICH WOULD LEAD TO A REDUCTION IN THE VIABILITY OF THE FARM UNIT AS A WHOLE.

 

NOTE:

For the purpose of Policies H10 and H11 'agriculture' is as defined in Section 336 of The Town and Country Planning Act 1990.

 

 

Infilling

 

6.56     Limited infilling has generally been accepted in the Green Belt on sites within villages which are physically contained by existing development. In South Bedfordshire, limited infilling has normally been permitted on sites for up to 2 dwellings in small gaps in otherwise built up frontages. However, most other types of development - and infilling on larger sites - was generally resisted, even though some villages, by virtue of their size, form and character, and range of services and facilities available, were suitable for such development while others were inappropriate for even the limited level of infilling normally permitted. PPG2 (March 1999) sets out Government advice about how Green Belt villages should be dealt with in local plans - dependent upon the level of development which the planning authority considered appropriate. This could be:

 

(i)         villages where no new building beyond that needed for specified appropriate purposes would be permitted;

 

(ii)        villages where limited infilling, limited redevelopment and limited extension to non-residential property would be permitted; or

 

(iii)       where limited development, on a scale greater than infilling, or limited expansion was proposed.

 

6.57     Where only limited infilling, other limited redevelopment and limited extension to non-residential property is proposed, the advice is that the village should either be 'washed over' and listed in the Development Plan or should be inset (that is excluded from the Green Belt). The approach of this plan accords with the former option. Infilling boundaries are shown around these villages in Appendix 4 of the Plan which forms part of the Proposals Map.

 

6.58     As set out in the Green Belt chapter of this local plan, the District Planning Authority has examined all Green Belt villages and identified three - Chalton, Kensworth and Stanbridge - where limited infilling, limited redevelopment and limited extension to non-residential property will normally be allowed (Policy GB3). Within boundaries defined on the Proposals Maps at these villages, (see Appendix 4), limited infilling in accordance with that defined at Policy H12 will be permitted.

 

POLICY H12

 

LIMITED INFILLING WILL BE PERMITTED IN VILLAGES WITHIN CATEGORY 2 AS SET OUT IN POLICY GB3 OF THIS PLAN, PROVIDED:

 

(i)        THE SITE IS WITHIN THE INFILLING BOUNDARIES DEFINED FOR THE VILLAGE ON THE PROPOSALS MAP.

 

(ii)       THE PROPOSAL IS FOR THE DEVELOPMENT, FOR UP TO TWO DWELLINGS OF A SMALL GAP IN AN OTHERWISE BUILT UP RESIDENTIAL FRONTAGE (UNLESS A LARGE SITE IS SPECIFICALLY PROPOSED IN THIS LOCAL PLAN).

 

(iii)      THE DWELLING OR DWELLINGS PROPOSED HAVE A PLOT SIZE AND FRONTAGE LENGTH WHICH IS SIMILAR TO THOSE OF ADJOINING FRONTAGE PROPERTIES.

 

(iv)      THERE IS NO ADVERSE IMPACT ON THE SETTING OF THE SITE, THE CHARACTER OF THE AREA, AND SURROUNDING PROPERTIES AND USES.

Extensions and Replacement Dwellings in the Green Belt

6.59     Although Policy GB1 imposes a general presumption against residential development in the Green Belt, the District Planning Authority recognises that it would be unreasonable to refuse planning permission for the modest extension of existing dwellings in the Green Belt or the replacement of existing dwellings where these become unsuitable for continued domestic use. Modest extensions are those that are not disproportionate to the 'original' building and create no need for additional infrastructure. The 'original' building refers to the building as it existed on 1st July 1948, or if the building was erected after this date, as originally built.

 

6.60     However, the District Planning Authority is concerned over the scale, character, appearance and location of some extensions and replacement dwellings and the impact which they have in the countryside, on the smaller settlements in the District, and on the openness of Green Belts.

 

6.61     The District Planning Authority is convinced of the need to maintain the openness of the Green Belt and protect its visual amenities – as advised in PPG2. Large or poorly designed or located extensions, or replacement dwellings reduce the openness of the Green Belt and injure its visual amenities, damage public confidence in the Green Belt and conflict with objectives for the use of land within it. Accordingly:

 

POLICY H13

 

EXTENSIONS TO DWELLINGS IN THE GREEN BELT WILL ONLY BE PERMITTED PROVIDING THAT THE PROPOSED EXTENSION IS MODEST IN SCALE AND DOES NOT RESULT IN DISPROPORTIONATE CUMULATIVE ADDITION OVER AND ABOVE THE SIZE OF THE ORIGINAL BUILDING, HAVING REGARD TO THE NEED TO MAINTAIN THE OPENNESS AND PROTECT THE VISUAL AMENITIES OF THE GREEN BELT.

 

IN CONSIDERING THE EFFECT OF A PROPOSED EXTENSION ON THE OPENNESS OF THE GREEN BELT THE DISTRICT PLANNING AUTHORITY WILL TAKE INTO ACCOUNT THE LOCATION OF THE EXISTING DWELLING AND ITS RELATIONSHIP TO OTHER DEVELOPMENT IN THE VICINITY.

 

PLANNING PERMISSION WILL NOT BE GRANTED FOR THE EXTENSION OF EXISTING DWELLINGS WHERE THIS WOULD HAVE THE EFFECT OF CREATING AN ADDITIONAL DWELLING.

 

THE PROPOSED EXTENSION WILL ALSO BE JUDGED AGAINST THE CONSIDERATIONS SET OUT IN POLICY H8.

 

 

6.62     In pursuing the aims of Green Belt policy, the District Planning Authority will exercise strict control over the erection of replacement dwellings. The District Planning Authority is of the view that the replacement of an existing dwelling will only be required exceptionally. Sympathetic renovation and improvement of substandard dwellings to restore them to habitable condition is usually possible and only in circumstances where this is clearly impracticable will the need for a replacement dwelling be accepted. Any dwelling permitted will not be materially larger than the built form replaced, in terms of both height and footprint; will be capable of being accommodated within existing infrastructure and will integrate with its landscape and village setting. The new dwelling will also have no greater impact on the openness of the Green Belt than the dwelling which it is to replace. In such circumstances the following policy will apply:

 

POLICY H14

 

A.        PLANNING PERMISSION WILL NOT BE GRANTED FOR A REPLACEMENT DWELLING IN THE GREEN BELT UNLESS IT WOULD:

 

(i)        NOT BE MATERIALLY LARGER THAN;

 

(ii)       BE NO MORE INTRUSIVE IN THE LANDSCAPE THAN; AND

 

(iii)      OCCUPY THE SAME FOOTPRINT AS;

 

THE DWELLING IT REPLACES.

 

B.         WHERE A REPLACEMENT DWELLING IS APPROVED CONDITIONS MAY BE IMPOSED WHICH REMOVE PERMITTED DEVELOPMENT RIGHTS FOR EXTENSIONS AND INCIDENTAL BUILDINGS.

 

C.        PLANNING PERMISSION WILL NOT BE GRANTED FOR THE REPLACEMENT OF TEMPORARY DWELLINGS, MOBILE HOMES, CARAVANS OR OTHER DWELLINGS CONSTRUCTED OF SHORT LIFE MATERIALS, WITH A PERMANENT DWELLING.

Mobile Homes

6.63     The District Council recognises that mobile homes can make a valuable contribution to the housing stock by helping to meet housing needs and a number of sizeable mobile home parks exist in the rural parts of the District which have been established for many years. The District Council is of the view however, that because extensions to these existing parks, new parks or new individual mobile homes have a similar potential impact on the countryside and a similar need for services as permanent dwellings, they should be assessed as such. In addition, the non-permanent nature of mobile homes means that such development can ultimately give rise to additional demands for permanent residential accommodation in the Green Belt. For these reasons the following policy will apply:

 

POLICY H15

 

A.        APPLICATIONS FOR THE SITING OF MOBILE HOMES OR RESIDENTIAL CARAVANS IN THE GREEN BELT WILL BE TREATED IN THE SAME WAY AS APPLICATIONS FOR PERMANENT DWELLINGS AND JUDGED AGAINST THE PROVISIONS OF POLICIES GB1 AND GB3 OF THIS PLAN.

 

B.         REDEVELOPMENT OF A MOBILE HOME OR RESIDENTIAL CARAVAN PARK FOR A USE WHICH IS INAPPROPRIATE TO A RURAL AREA (SEE POLICY GB1) WILL NOT BE PERMITTED.

Gypsy Sites

6.64     Paragraph 11 of Circular 1/94 requires Local Authorities to consider the register of unused and under used land owned by public bodies as an aid to identifying potentially suitable locations for gypsy sites. An examination of the sites on this register has not revealed any land which is not either allocated for development in the Local Plan or which is suitable for use as a gypsy site.

 

6.65     The Local Planning Authority is not aware of any other sites in the District which are suitable for gypsy site use. However, the District Council accepts that such sites may exist and may be the subject of proposals for the establishment of accommodation for gypsies.

 

6.66     Any proposals for the establishment of additional gypsy sites or for the extension to gypsy sites for permanent, transit or temporary stopping place purposes will be considered on their merits and against the policy below and other relevant policies in the South Bedfordshire Local Plan.

 

POLICY H16

 

A.        WITHIN THE GREEN BELT PLANNING PERMISSION WILL NOT BE GRANTED FOR THE PROVISION OF NEW GYPSY SITES OR THE EXPANSION OF EXISTING GYPSY SITES.

 

B.         WITHIN THE TOWNS AND VILLAGES EXCLUDED FROM THE GREEN BELT, PROPOSALS FOR THE ESTABLISHMENT OF GYPSY SITES WILL BE CONSIDERED ON THEIR MERITS IN THE LIGHT OF THE POLICIES OF THE SOUTH BEDFORDSHIRE LOCAL PLAN.

 

IN ADDITION, ALL PROPOSALS FOR THE ESTABLISHMENT OF NEW GYPSY SITES, WILL BE SUBJECT TO THE FOLLOWING REQUIREMENTS:

 

(i)        THE SITE MUST HAVE SUITABLE ACCESS TO THE PUBLIC HIGHWAY FOR CARS, CARAVANS AND LORRIES AND BE SURFACED TO A STANDARD ADEQUATE FOR THE PARKING AND MANOEUVRING OF CARS, CARAVANS AND LORRIES;

 

(ii)       THE SITE MUST BE SERVED BY ELECTRICITY, DRINKING WATER, SEWERAGE, AND DRAINAGE AND REFUSE COLLECTION;

 

(iii)      A WORKING AREA ADEQUATE FOR THE COMMERCIAL ACTIVITIES OF THE SITE'S OCCUPANTS MAY ALSO NEED TO BE PROVIDED, IF APPROPRIATE;

 

(iv)      THE SITE MUST BE LAID OUT AND DESIGNED TO MINIMISE IMPACT ON THE AMENITY OF ADJOINING LAND USES AND TO ALLOW FOR THE PROVISION OF ON-SITE LANDSCAPING AND SCREENING;

 

(v)       THE SITE SHOULD BE WELL RELATED TO SHOPS, SCHOOLS AND ESSENTIAL SERVICES.

 

NOTE:

(i)         Sites for long-term use should provide a safe playing area for children within the site.

 

(ii)        Standard conditions for Mobile Home Parks are available separately from the District Council's Environmental Health Department.